wave

FONTENUOVA

Design, construction, and installation of an electrical panel for managing two booster pumps via soft starters.

 

Data

Year: 2019
Project status: Closed
Client: ACEA
Location: MONTELANICO (ROMA)

Details

Type of work: Electrical schematics design
Construction of an electrical panel with two soft starter pumps of 55 kW each, with automatic stop when the tank reaches maximum level.
Construction of the site’s electrical and power system.
Internal lighting system for the electrical room.