Veroli Water Center

Project documentation

wave

Veroli Water Center

Design, construction, and installation of an MV cabin, main LV switchboard (QGBT), and inverter starter panel managed via PLC.

Data

Year: 2019
Client: Acea Ato 5
Location: Veroli, Frosinone

Details

Plant design: calculation report, electrical report, lighting calculation for indoor and outdoor areas, cabin layout, panel rooms, and cable ducts.
Installation of MV cabin with two 1000 kVA transformers.
Construction of incoming main LV switchboard (QGBT).
Transformers.
Construction of pump panel with inverter starters: 2 units of 400 kW, 2 units of 110 kW, and 1 unit of 75 kW.
Construction of PLC panel for automation and remote control of the plant.
Installation of internal and external lighting and power systems.